S & T work Middle Forge

  • Doug Johnson
  • May 21
  • 1 min read

Continuing the upgrade of this junction the S&T team lead a small group of volunteers to install two new signal posts. This was a two day task with site preparation being done on the first day.

The two deep holes were excavated using the RRV equipped with auger along with some manual work. Day 2 was the lifting and installing of both posts into the prepared holes.

The S&T team will now spend time working to prepare and commission the signals, part of which is migration of existing signals to the new posts.



The start of lowering the first signal post.  In the foreground you can see one of the catch pits installed during November 2024 as part of the drainage upgrade.
The start of lowering the first signal post. In the foreground you can see one of the catch pits installed during November 2024 as part of the drainage upgrade.