S & T work Middle Forge
- Doug Johnson
- May 21
- 1 min read
Continuing the upgrade of this junction the S&T team lead a small group of volunteers to install two new signal posts. This was a two day task with site preparation being done on the first day.
The two deep holes were excavated using the RRV equipped with auger along with some manual work. Day 2 was the lifting and installing of both posts into the prepared holes.
The S&T team will now spend time working to prepare and commission the signals, part of which is migration of existing signals to the new posts.